ARISSat-1 Activation 04/122011年04月08日 22時53分

Subject: [amsat-bb] ARISSat-1 Activation 04/12
From: Clint Bradford
Date: Thu, 07 Apr 2011 13:19:40 -0700

>From AMSAT-NA -

The transmissions will begin on Monday 11 April 2011 at 14:30 UTC and continue
until 10:30 UTC on 13 April 2011. 

Due to the fact that the solar panels are covered, the satellite will be
powered only by the onboard battery. The satellite will run in low power mode.
This means that the transmissions will cycle ON/OFF. They will be ON for 40-60
seconds and OFF for 2 minutes.

145.950 MHz FM Downlink:
FM transmissions will cycle between a voice ID, select telemetry values, 24
international greeting messages in 15 languages and SSTV images. One of the
messages will be a conversation between Yuri Gagarin and ground control.

145.919 MHz CW Beacon
The CW transmissions will be callsign ID, select telemetry, and callsigns of
people actively involved with the ARISS program.

145.920 MHz SSB BPSK-1000 Telemetry
The BPSK transmissions will feature a new 1kBPSK protocol developed by Phil
Karn, KA9Q to be readable in low signal level conditions. The BPSK data will
transmit satellite telemetry. Free ground station soundcard demodulator and
display software will be available.

Note that the linear transponder will not be active during this event.

コメント

コメントをどうぞ

※メールアドレスとURLの入力は必須ではありません。 入力されたメールアドレスは記事に反映されず、ブログの管理者のみが参照できます。

※なお、送られたコメントはブログの管理者が確認するまで公開されません。

※投稿には管理者が設定した質問に答える必要があります。

名前:
メールアドレス:
URL:
次の質問に答えてください:
Tropical fish?

コメント:

トラックバック