GOLIAT CW heard #22012年02月19日 08時21分

管制局HPに登録されている受信MP3ファイルでは、GOLIAT CW の合間に、1分毎に
AFSK も聞こえています。

Goliat signal decoded today! (6:30UTC, 18 Feb 2012)
The first frames of Morse data were received and decoded for the 8:30 am
pass (local time of Bucharest). The signal was loud and the telemetry
received is as follows:
http://www.goliat.ro/images/stories/Satdata/goliat%20telemetry.png

The ground station was tracking Object J during the pass.
We ask once more for the support of radio amateurs around the globe as
telemetry from the satellite.
The audio recording of the pass can be downloaded here. The file contains
several succeding AFSK and Morse data frames.
http://www.goliat.ro/images/stories/mp3/GOLIAT.6.30UTC18.02.2012.mp3

Update
The teams at the two ground stations are working hard now to receive and
decode the transmissions from GOLIAT. We will make an update to the website
immediately after the first telemetry is decoded.
http://www.goliat.ro/

ここまでの TLE情報
ALMASAT-1  38078  B
PW-SAT     38079  C
MASAT      38081  E
XATCOBEO   38083  G
GOLIAT     38085  J

RS-39 Report2012年02月19日 10時11分

Report on the work of the satellite "Chibis-M"
Category: News of the project Chibis-M, 02.17.2012 17:09 Age: 1 day.

Three weeks of hard work with the microsatellite "Chibis-M" have led to a
long-awaited results.

During sessions 16 and February 17, 2012 by ground stations in Kaluga, Tarus,
Panska Ves (Czech Republic) and Budapest (Hungary) carried out a scientific
telemetry data reception at 2.2 GHz radio transmitter with onboard NEMO.
A discharge of scientific information, accumulated scientific data block
(BND-B) of the RFA devices (radio frequency analyzer) and FCC (digital camera).

The resulting scientific information on the Earth are now processed and
analyzed in IKI.

During the past continued to work on business systems, including satellite
orbital parameters were refined using the instrument on board the satellite
receiver GPS (part of the official apparatus developed NILAKT).

Work was done to set up different modes of orientation and stabilization of
the spacecraft.

Daily sessions are held official receipt of telemetry data to ground control
centers in the cities of Kaluga and Krasnoyarsk.

The results of processing the received telemetry data service on the 435 MHz
radio show that temperature and voltage onboard network of MS "Chibis-M" are
in the range of valid values (voltage onboard network of about 12.5 - 14.0
volts, temperature from 0 to 23 degrees.)

Work on putting MS "Chibis-M" in the operation continues.
http://tinyurl.com/RS-39-Chibis-M

ISS QSO全景 with UI-View322012年02月19日 17時07分

16:52-17:01JST, 19 Feb 2012, Ele 21 W-N-NE, 145.825MHz AFSK