All- We have canceled the upcoming SSDV downloads as of 2026-02-01 T22:27:00 while
we sort out our attitude problem. I will let you know when these resume.The beacon
will still be active, and US stations may hear data as we pull down telemetry.
That was the satellite responding to commands I was sending it. Somewhere in there
should be two ‘RES CPQ’ responses, which was me clearing the SSDV downlink queue.
We need to pause our payload operation for what is hopefully only a few days.
The ‘RES GPW’ line is telemetry from the power system. The battery is at 4.22V,
0.12A current. Battery temperatures are around 13 deg C. The 'RES GTY' is a response
from the accelerometer / gyroscope. @LSC